Founded in 1987, Bimonthly
Supervisor:Jiangxi University Of Science And Technology
Sponsored by:Jiangxi University Of Science And Technology
Jiangxi Nonferrous Metals Society
ISSN:1674-9669
CN:36-1311/TF
CODEN YJKYA9
RAO Yun-zhang, HUANG Kai-long, LI Chuang, CHEN Guo-liang, ZHU Wei-min, WANG Chun-hua. Fuzzy comprehensive optimization of productive scale during transition from open pit to underground mining[J]. Nonferrous Metals Science and Engineering, 2011, 2(5): 61-64.
Citation: RAO Yun-zhang, HUANG Kai-long, LI Chuang, CHEN Guo-liang, ZHU Wei-min, WANG Chun-hua. Fuzzy comprehensive optimization of productive scale during transition from open pit to underground mining[J]. Nonferrous Metals Science and Engineering, 2011, 2(5): 61-64.

Fuzzy comprehensive optimization of productive scale during transition from open pit to underground mining

More Information
  • Received Date: April 21, 2011
  • Published Date: October 30, 2011
  • During the transition from open pit to underground mining, a reasonable scale of production is necessary and feasible by optimizing it through the application of fuzzy mathematics. By applying the fuzzy comprehensive evaluation theory and taking all factors into consideration, this paper selects the five comprehensive evaluation index including the total investment, operation cost, net present value, length of service, increased employment, builds a fuzzy and comprehensive evaluation model of production scale of mines, and then uses it to optimize the scale of production during the transition from open pit to underground mining.
  • [1]
    徐长佑.露天转地下开采[M].武汉:武汉工业大学出版社, 1989.
    [2]
    胡永宏, 贺思辉.综合评价方法[M].北京:科学出版社, 2000.
    [3]
    甘德清, 陈超, 卢建宏, 等.石人沟铁矿露天转地下合理生产规模优化研究[J].金属矿山, 2007, (8):127-129. http://d.wanfangdata.com.cn/Thesis/Y873888
    [4]
    杜树浩, 李勇, 岳发强.利用模糊综合评价法确定矿山生产规模[J].采矿工程, 2005, 26(5):21-23. http://d.wanfangdata.com.cn/Periodical/huangj200505006
    [5]
    陈战强, 陈超, 等.模糊综合评价在石人沟铁矿生产规模优化中的应用[J].中国矿山工程, 2006, 35(3):10-12. http://www.cqvip.com/QK/96331A/200603/22357102.html
    [6]
    陆刚, 韩可琦, 肖桂彬.矿山通风系统可靠性的综合模糊评价[J].采矿与安全工程学报, 2008, 25(2):244-247.
    [7]
    赖祥璞, 刘世光, 慕娟.模糊综合评判法在确定合理精矿品位中的应用[J].矿冶, 1999, (4):26-28. doi: 10.3969/j.issn.1005-7854.1999.03.007
    [8]
    刘湘平, 古德生, 罗一忠, 等. 深井采场凿岩硐室稳定性模糊综合评价[J]. 2008, 28(3): 22-25. http://www.cqvip.com/QK/93291X/200803/27502606.html
    [9]
    安文龙, 王青海.运用模糊决策理论优化采矿方法[J].黄金科学技术, 2005, 13(6):23-26. http://www.oalib.com/paper/4764234
    [10]
    盛继亮.地下工程围岩稳定性模糊综合评价模型研究[J].岩石力学与工程学报, 2003, 22(增1):2418-2421. http://d.wanfangdata.com.cn/Periodical/yslxygcxb2003z1062
    [11]
    杨绮.二元相对比较法在风险节税中的应用[J].统计与决策, 2007, (4):34-35. http://www.cqvip.com/Main/Detail.aspx?id=24153214
    [12]
    吴邦强, 吴仲雄, 林美群.模糊数学在德宝铜矿Ⅷ矿段采矿方法选择中的应用[J].有色金属, 2009, 61(6):8-10. http://d.wanfangdata.com.cn/Periodical/ysjs-ks200906003
  • Related Articles

    [1]GAN Minglong, LI Yameng, FU Junxiang. Phase transition and upconversion luminescent properties of NaYF4: Yb, Er@SiO2 at high temperature[J]. Nonferrous Metals Science and Engineering, 2021, 12(1): 75-80. DOI: 10.13264/j.cnki.ysjskx.2021.01.010
    [2]ZHAO Lv, ZHU Jun, JIANG Xiang, ZHANG Lei, ZHANG Tingliang. Optimization experiment and production practice of leaching process in zinc hydrometallurgy[J]. Nonferrous Metals Science and Engineering, 2019, 10(6): 25-30. DOI: 10.13264/j.cnki.ysjskx.2019.06.005
    [3]ZHAO Kui, LIU Weifa, ZENG Peng, ZHANG Liang. Optimization of structural parameters of deep stope based on combination weighting game theory[J]. Nonferrous Metals Science and Engineering, 2018, 9(2): 70-74. DOI: 10.13264/j.cnki.ysjskx.2018.02.012
    [4]ZHU Zhi-xun, LI Xin-ping, CHEN Cheng, LI Jian-ling. Effects of imino groups for the electrochemical properties of nickel complexes polymer with schiff base[J]. Nonferrous Metals Science and Engineering, 2016, 7(2): 8-13. DOI: 10.13264/j.cnki.ysjskx.2016.02.002
    [5]RAO Yunzhang, ZHANG Xueyan. Based on logistic regression model to determine the weight fuzzy comprehensive evaluation method in the application of the slope stability analysis[J]. Nonferrous Metals Science and Engineering, 2015, 6(6): 111-115. DOI: 10.13264/j.cnki.ysjskx.2015.06.020
    [6]ZHANG Shuiping, HUANG Liangliang, ZHANG Chi, HE Zhongguo. Ventilation system optimization of mining capacity expansion by computer[J]. Nonferrous Metals Science and Engineering, 2015, (2): 99-103. DOI: 10.13264/j.cnki.ysjskx.2015.02.019
    [7]DENG Fei, TAO Ming, LUO Fuyou, LUO Fulong, YIN Libing. Optimization of stoping scheme based on comprehensive AHP and fuzzy evaluation[J]. Nonferrous Metals Science and Engineering, 2014, 5(4): 90-95. DOI: 10.13264/j.cnki.ysjskx.2014.04.017
    [8]PENG Pin, CHEN En-hu, XUE Zhi-quan, LI Ming-jian. On the production scheduling optimization of aluminum enterprises[J]. Nonferrous Metals Science and Engineering, 2012, 3(1): 23-26. DOI: 10.13264/j.cnki.ysjskx.2012.01.017
    [9]ZHANG Ying. The Application of Multi-attribute Decision Making Method in Mining Scale[J]. Nonferrous Metals Science and Engineering, 2011, 2(2): 86-89.
    [10]CAI Xu. On Adjusting and Optimizing Operating Parameters of 6-S Shakers Used in the Dressing Plant of a Cobalt Oxide Mine[J]. Nonferrous Metals Science and Engineering, 2010, 24(1): 40-42.
  • Cited by

    Periodical cited type(3)

    1. 皮溅清,王明理,张延玲,赵宏博,余阚,李更. Al_2O_3/TiO_2/Na_2O对石灰在炼钢渣中溶解的影响. 有色金属科学与工程. 2025(01): 1-7 . 本站查看
    2. 刘颖,张俊杰,沈汉林,张深根. 二次铝灰资源化研究进展. 稀有金属. 2024(02): 277-287 .
    3. 齐涛,刘璇,满苏醇,刘锦川,包文昊. 二次铝灰基多孔莫来石陶瓷制备研究. 非金属矿. 2024(03): 18-21 .

    Other cited types(2)

Catalog

    Article Metrics

    Article views (87) PDF downloads (1) Cited by(5)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return