Citation: | LUO Zhang, LI Qi-yue, ZHAO Fu-jun. Study and Exploitation of Expert System of Which Based on Fuzzy Mathematics[J]. Nonferrous Metals Science and Engineering, 2002, 16(3): 11-15. |
[1] |
《采矿手册》编辑委员会.采矿手册(第7卷) [M].北京:冶金工业出版社, 1991. 140-142.
|
[2] |
Zadeh, L A. Fuzzy sets[J].Information and Control, 1965, (8):338-353.
|
[3] |
Chen Shyi-Ming. Fuzzy group decision making forevaluating the rate of aggregative risk in software development[J].Fuzzy Sets and Systems, 2001, 118(1):75-88. doi: 10.1016/S0165-0114(99)00103-7
|
[4] |
Li Rong-Jun. Fuzzy method in group decision masking[J]. Computers and Mathematics with Applications, 1999, 38(1):91-101. doi: 10.1016/S0898-1221(99)00172-8
|
[5] |
冯夏庭, 王泳嘉.人工智能在矿山岩体边坡工程中应用[J].化工矿山技术, 1995, 24(1):1-3. http://www.cqvip.com/QK/92932X/199501/1785209.html
|
[6] |
萨师煊, 王珊.数据库系统概论[M].北京:高等教育出版社, 1991. 4.193-195.
|
[7] |
林尧瑞.专家系统原理与实践[M].北京:清华大学出版社, 1988.272-280.
|
[8] |
Frices E F, Welsh H. Expert systems and real-time Mine monitoring[P]. 19th APCOM, 1986.824-834.
|
[1] | Deng Fei, HAN Xiao-liang, Liao sheng-yin, Wang Chun-hui, Hu Long-fei, Yin Li bing. The Numerical Simulation Research of Deep Hole Blasting On the Mine Roadway's Vibrating intensiy[J]. Nonferrous Metals Science and Engineering, 2015, 6(6): 106-110. DOI: 10.13264/j.cnki.ysjskx.2015.06.019 |
[2] | WANG Liu, RAO Yunzhang, ZHU Weimin, SHAO Yajian. Delay time identification of millisecond blasting based on HHT method[J]. Nonferrous Metals Science and Engineering, 2015, 6(1): 70-73. DOI: 10.13264/j.cnki.ysjskx.2015.01.013 |
[3] | DENG Fei, CHENG Qiuting, CHEN Yanhong, HU Yonghui, WANG Xiaojun. Experimental study on the optimized blasting parameters for medium-depth hole[J]. Nonferrous Metals Science and Engineering, 2015, 6(1): 66-69. DOI: 10.13264/j.cnki.ysjskx.2015.01.012 |
[4] | WU Xianzhen, YIN Libing, HU Wei, GAO Xiang, WANG Liangliang. Vibration intensity of multi milliseconds blasting in underground mine based on LS-DYNA[J]. Nonferrous Metals Science and Engineering, 2014, 5(6): 100-104. DOI: 10.13264/j.cnki.ysjskx.2014.06.017 |
[5] | RAO Yun-zhang, WANG Chun-hua, HUANG Tie-ping, PENG Le-ping. The optimization of blasting parameters in the medium depth hole in a limestone mine[J]. Nonferrous Metals Science and Engineering, 2011, 2(6): 47-51. |
[6] | SUN Zhi-hua, LIU Hong-xing. The Optimized Technical Study of Medium-length Hole Explosive Technique in High Temperature and High Sulphur Stope of Copper Mine[J]. Nonferrous Metals Science and Engineering, 2010, 24(1): 29-31, 39. |
[7] | LEI Rong-hua. The Application of Millisecond-Detonator in Piaotang Mine[J]. Nonferrous Metals Science and Engineering, 2008, 22(1): 16-18. |
[8] | WANG Shi-ming. The Research of Trench Roof at the Bottom of Stope of Large Diameter Deep Hole Mining[J]. Nonferrous Metals Science and Engineering, 2006, 20(1): 15-18. |
[9] | ZHANG Xu-sheng, YU Jian. Influence of Joint Fissure upon the Blasting Effect of Mediunm-length Hole in Dahongshan Copper Mine[J]. Nonferrous Metals Science and Engineering, 2005, 19(4): 10-13, 39. |
[10] | GUO Zhao-lei. The Study of a Series of Blasting Funnel Tests of Medium-length Hole Mining[J]. Nonferrous Metals Science and Engineering, 2004, 18(3): 3-6. |