Founded in 1987, Bimonthly
Supervisor:Jiangxi University Of Science And Technology
Sponsored by:Jiangxi University Of Science And Technology
Jiangxi Nonferrous Metals Society
ISSN:1674-9669
CN:36-1311/TF
CODEN YJKYA9
XU Yixin, WANG Xiaoqian, LU Zengxiang. Mining right evaluation method improved based on CAPM model[J]. Nonferrous Metals Science and Engineering, 2022, 13(5): 108-113. DOI: 10.13264/j.cnki.ysjskx.2022.05.013
Citation: XU Yixin, WANG Xiaoqian, LU Zengxiang. Mining right evaluation method improved based on CAPM model[J]. Nonferrous Metals Science and Engineering, 2022, 13(5): 108-113. DOI: 10.13264/j.cnki.ysjskx.2022.05.013

Mining right evaluation method improved based on CAPM model

More Information
  • Received Date: December 09, 2021
  • Available Online: November 07, 2022
  • When the income method is used to evaluate the value of mining rights, the traditional capital asset pricing model (CAPM) being applied to determine the discount rate cannot reflect the impact of non-main business investment and income made by mining enterprises around mineral resources development on discount rate. The system risk correction coefficient α was introduced to adjust the impact of the ratio of the change rate of non-main business profit and the change rate of main business income of mining enterprises on system risks, developing an improved CAPM model. With the mining right evaluation of a certain gold mine as the background, the system risks and non-system risks of the enterprise were measured based on the comprehensive leverage coefficient, and the minging right value was evaluated by using the improved CAPM model. The results show that the improved CAPM model is suitable for mining right evaluation by adopting the income method.
  • [1]
    李颖, 王安建, 李天骄. 中国矿产资源风险勘查资本市场的建设研究[J]. 中国工程科学, 2019, 21(1): 74-80. https://www.cnki.com.cn/Article/CJFDTOTAL-GCKX201901012.htm
    [2]
    JIANG G Y. Comparative study on the characteristics and development modes of international mining capital market[J]. IOP Conference Series: Earth and Environmental Science, 2019, 267(6): 062016. doi: 10.1088/1755-1315/267/6/062016
    [3]
    刘勋涛. 对矿业权价值评估中折现现金流量法的思考[J]. 理论月刊, 2010, 347 (11): 156-159. doi: 10.3969/j.issn.1004-0544.2010.11.044
    [4]
    纪爽怡. 简析矿业权价值评估相关方法[J]. 现代企业, 2019, 411 (12): 64-65. doi: 10.3969/j.issn.1000-9671.2019.12.034
    [5]
    李福涛. 浅谈现金流量分析在项目投资评价中的应用[J]. 价值工程, 2020, 39(11): 239-240. doi: 10.3969/j.issn.1006-4311.2020.11.102
    [6]
    何卫红, 许世珍. 收益法评估参数应用现状、效果及优化——基于软件信息业的90个评估样本[J]. 现代管理学, 2021, 326 (3): 67-75. https://www.cnki.com.cn/Article/CJFDTOTAL-XDGL202103009.htm
    [7]
    王晶, 高建设, 宁宣熙. 收益法评估中折现率研究[J]. 管理世界, 2011, 211(4): 184-185. doi: 10.19744/j.cnki.11-1235/f.2011.04.027
    [8]
    李国桢. 资产定价理论的发展和风险的模型化[J]. 信息系统工程, 2018, 290(2): 161-162. https://www.cnki.com.cn/Article/CJFDTOTAL-XXXT201802094.htm
    [9]
    韦群. 资产评估折现率计算方法内在统一性问题思考[J]. 财会月刊, 2010, 568(36): 68-71. https://www.cnki.com.cn/Article/CJFDTOTAL-CKYK201036022.htm
    [10]
    赵清, 乌东峰. CAPM资产定价机制及中国适用性研究[J]. 东南学术, 2015, 250(6): 12-18. https://www.cnki.com.cn/Article/CJFDTOTAL-DLXS201506003.htm
    [11]
    ALHABEEB M. J. On the validity of the capital asset pricing model (CAPM)[J]. International Journal of Marketing Studies, 2020, 12(4): 1-13.
    [12]
    黎斌林, 申维. Downside-CAPM模型对矿业权评估中折现率的改进——以山东某金矿投资项目为例[J]. 矿业研究与开发, 2014, 34(1): 116-119. https://www.cnki.com.cn/Article/CJFDTOTAL-KYYK201401036.htm
    [13]
    郑明贵, 王训洪. 基于云物元模型的国内矿业项目并购财务风险预警评价[J]. 有色金属科学与工程, 2016, 7(1): 102-107. doi: 10.13264/cnki.ysjskx.2016.01.019
    [14]
    FANG Z, WU Y, JU F H, et al. Model derivation based on CAPM and empirical research in stock market[J]. Frontiers in Economics and Management, 2021, 2(6): 120-126.
    [15]
    薛红肖, 王琦. 基于层次分析法的海外矿业投资风险评价[J]. 中国矿业, 2018, 27(6): 53-56. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGKA201806012.htm
    [16]
    姜圆. 现代资产定价理论的研究和发展——基于有效市场假说和资产定价模型的视角[J]. 现代管理科学, 2021, 326 (3): 42-48. https://www.cnki.com.cn/Article/CJFDTOTAL-XDGL202103006.htm
    [17]
    黎斌林, 单胜召. 应用修正后的折现金流法对矿业权价值的评估[J]. 中国人口·资源与环境, 2013, 23(增刊2): 400-403. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGRZ2013S2102.htm
    [18]
    刘永阔. 基于CAPM模型的资产定价问题求解以及模型改进[J]. 商讯, 2021, 233(7): 174-175. https://www.cnki.com.cn/Article/CJFDTOTAL-SYJW202107085.htm
    [19]
    秦子航. 非上市企业收益法评估中的折现率改进[J]. 中国资产评估, 2020, 246(9): 42-47. https://www.cnki.com.cn/Article/CJFDTOTAL-ZCPG202009008.htm
    [20]
    徐建玲, 周志远, 云佳民. 收益法下特定风险调整系数的研究——以制造业科技企业为例[J]. 中国资产评估, 2021, 258(9): 56-63. https://www.cnki.com.cn/Article/CJFDTOTAL-ZCPG202109009.htm
    [21]
    HORENSTEIN A R. The unintended impact of academic research on asset returns: the capital asset pricing model alpha[J]. Management Science, 2020, 67(6): 3655-3673.
    [22]
    王晓红, 王梦瑶. 企业绩效、财务状况与杠杆风险——来自中国上市公司的实证研究[J]. 商业经济, 2019, 519 (4): 144-146. https://www.cnki.com.cn/Article/CJFDTOTAL-JJSY201904060.htm
    [23]
    林志伟. 企业价值评估中折现率的确定及实证分析[J]. 企业家天地, 2005(7): 25-26. https://www.cnki.com.cn/Article/CJFDTOTAL-QYJT200507013.htm
    [24]
    赖丹, 杨华, 罗翔. 经济政策不确定性对经营效率的影响——以有色金属行业上市公司为例[J]. 有色金属科学与工程, 2020, 11(4): 98-105. doi: 10.13264/j.cnki.ysjskx.2020.04.015
    [25]
    蔡晓凤, 赖丹. 基于资源禀赋差异的稀土资源税改革效应及方向研究[J]. 有色金属科学与工程, 2019, 10(2): 116-122. doi: 10.13264/j.cnki.ysjskx.2019.02.017
  • Related Articles

    [1]CHEN Guofang, TAN Xitong, ZHI Xueyi, YUAN Mingchang, GUO Shun. Research on reconstruction of ventilation system of mines with multi-sublevel based on ventsim system[J]. Nonferrous Metals Science and Engineering, 2019, 10(4): 94-99. DOI: 10.13264/j.cnki.ysjskx.2019.04.015
    [2]LI Ming-zhou, HUANG Jin-di, TONG Chang-ren, ZHANG Wen-hai. A composition soft-sensing model of FeO-Fe2O3-SiO2 ternary slag system based on two-temperature two-density method[J]. Nonferrous Metals Science and Engineering, 2016, 7(5): 37-41. DOI: 10.13264/j.cnki.ysjskx.2016.05.007
    [3]CHAI Li-yuan, WANG Hai-tang, YOU Xiang-yu, WANG Qing-wei, SHU Yu-de. Thermodynamics equilibrium of M(Ⅱ)-S-H2O system[J]. Nonferrous Metals Science and Engineering, 2012, 3(5): 8-13. DOI: 10.13264/j.cnki.ysjskx.2012.05.020
    [4]LIU Ping, DONG Su-wei, LI An-yun, CHEN Jin-qing, CHEN Xing-bin, YAO Wen-li. The Applications of ICP-MS in Analyzing Rare Earth Elements[J]. Nonferrous Metals Science and Engineering, 2011, 2(3): 83-87.
    [5]WANG Jian-ru, LIU Zu-wen, ZHU Qiang, XU Jian-hong. On the Factors Affecting the Phosephorus and Nitrogen Removal by Carrousel Oxidation Ditch Process[J]. Nonferrous Metals Science and Engineering, 2011, 2(1): 51-54.
    [6]LIU Xiao-sheng, ZHOU Bo. On Vectorization Error of Scanned Map Based on MAPGIS[J]. Nonferrous Metals Science and Engineering, 2009, 23(1): 45-48.
    [7]ZHANG Chun-lei, LIU Xue-jun. Application of Global Positioning System in Strip Mine[J]. Nonferrous Metals Science and Engineering, 2008, 22(4): 1-3.
    [8]SHEN Wen. Network Monitoring and Controlling System for Measurement Based on MODBUS[J]. Nonferrous Metals Science and Engineering, 2007, 21(2): 42-44.
    [9]GE Wen-jie, GUO Yu-hui. Design for Decision Support System of Serious Hidden Dangerous in Mine Based on GIS[J]. Nonferrous Metals Science and Engineering, 2007, 21(2): 40-41, 47.
    [10]ZHOU Ke-liang, LIANG Ling. Ration Pouring Control System for Lead Anode Plate Based on Profibus[J]. Nonferrous Metals Science and Engineering, 2006, 20(4): 21-23.

Catalog

    Article Metrics

    Article views (128) PDF downloads (9) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return