浅谈矿区整合独立坐标系的建立

On the Establishment of Independent Coordinate System for Mining Area Integration

  • 摘要: 矿区整合通常会涉及到跨带的整合,在这过程中由于高程归化和高斯投影变形使改正后的长度与实际距离不等,给地质勘探施工放样带来不便。通过详细介绍露天矿整合独立坐标系的建立方法,较好解决了长度变形影响地质勘探施工产生的问题,给矿区整合提供便利。

     

    Abstract: Mining region integration usually involves cross mineral band integration as a result of elevation natural ization and deformation gaussian projection. The variations between the rectified length and the actual figure render the inconvenience of geological prospect and construction lofting. This paper elaborates the establishment of an independent coordinate system for addressing the impact of length deformation on geological prospecting and con struction so as to facilitate the integration of the mining area.

     

/

返回文章
返回