贫化电炉冰铜流槽系统改造

Retrofit of the matte-launder system of electric furnace

  • 摘要: 贵溪冶炼厂于1998年对贫化电炉冰铜流槽系统成功地进行了改造, 将7.5m长的冰铜流槽缩短为3.1m长, 其与水平面的倾角由原来的7°25'改为12°。两年多的生产实践证明, 这一成功的改造消除了原有流槽过长所引发的烟气量多、流槽冰铜粘附率高及石墨流槽消耗量大等一系列问题, 改善了作业环境, 降低了石墨流槽维修成本, 提高了能源利用率。

     

    Abstract: The matte-launder system of the slag cleaning electric furnace was retrofitted successfully in Guixi Smeltery in 1998. Its length was shorten from 7.5m to 3.1m and its horizontal inclination was enlarged from 7°25'to12°. More than two years smelting practice had proved that the modification solved a lot of problems such as heavy smoke, over-consumed graphite launder and higher solid matte rate due to over-long launder. As a result, the operation environment had been significantly improved and the maintenance cost had been decreased as well as the energy utilization factor had been increased.

     

/