数字高程模型在矿山遥感动态监测中的应用

The Application of Digital Elevation Model to Mine's Dynamic Monitoring

  • 摘要: 以江西德兴铜矿矿山开采状况为例,采用两种方式分别建立了该地区1986年和2000年的数字高程模型(DEM)。并结合三维地理信息系统和遥感技术,将ASTER彩色合成影像作表层贴膜,生成3D矿山地形动态演示。同时,在GIS软件平台下根据DEM对尾矿库所在区域做剖面分析,将两时相DEM地形剖面相比较,变化信息可以被清晰的提取出来。最后,对尾矿库的空间形态做体积量算,由此调查并预测矿山的挖掘量和尾矿的堆积量,以真实数据反映人类活动对于自然环境的影响,并为土地复垦和生态重建等决策提供理论依据。

     

    Abstract: The research takes the Dexing Copper Mine in Jiangxi Province as an example to generate two Digital Elevation Models (DEMs) through different methods in 1986 and 2000. And the DEM is fused with the ASTER color image in the copper mine, based on RS technology combined with 3D-GIS. At the same time, the profiles of gangue pool are portrayed under GIS software, which clearly show the change of topography. At the last, the volume of gangue pool is calculated through the analysis of DEM, which can be the proof to investigate and monitor the excavated situation. The topography change and the excavating volume 3D modeling reflect the influence of the human mining activities on the nature, and provide us a theoretical base for land reclaiming and ecological rebuilding.

     

/

返回文章
返回