The Debugging and Innovation of the Convertor Slag Floatation Project in Guixi Smeltery
-
Graphical Abstract
-
Abstract
The convertor slag floatation project was put into production in Guixi Smeltery on June 13, 2000.The main productive targets haven't reached the demand of design because of the influence of design and the selection of equipment.The process become perfect and the main targets reach the demand of design, also it makes good economic benefits after debugging and innovating the process.This paper introduce the measures and experiences.
-
-