Citation: | LI Jun, WU Si-ping. The New Closed Cycle Process for Producing Tungsten Carbide Powder[J]. Nonferrous Metals Science and Engineering, 2010, 24(3-4): 159-160. |
[1] |
张立, 陈泳华, 吴玉霜.废钨粉和碳化钨粉综合利用工艺[J].稀有金属, 1997, 20(1):76-79. http://www.cnki.com.cn/Article/CJFDTOTAL-ZXJS701.014.htm
|
[2] |
陈立宝, 贺跃辉, 黄伯云, 等.钨合金废料的资源再生利用技术[J].粉末冶金技术, 2003, 21(3):169-174. http://industry.wanfangdata.com.cn/yj/Detail/Periodical?id=...
|