On the Establishment of Independent Coordinate System for Mining Area Integration
-
Graphical Abstract
-
Abstract
Mining region integration usually involves cross mineral band integration as a result of elevation natural ization and deformation gaussian projection. The variations between the rectified length and the actual figure render the inconvenience of geological prospect and construction lofting. This paper elaborates the establishment of an independent coordinate system for addressing the impact of length deformation on geological prospecting and con struction so as to facilitate the integration of the mining area.
-
-