Founded in 1987, Bimonthly
Supervisor:Jiangxi University Of Science And Technology
Sponsored by:Jiangxi University Of Science And Technology
Jiangxi Nonferrous Metals Society
ISSN:1674-9669
CN:36-1311/TF
CODEN YJKYA9
ZHANG Ping. Review on Factors Affecting Silver Recovery Out of Zinc Leaching Slag[J]. Nonferrous Metals Science and Engineering, 2011, 2(4): 26-27,52.
Citation: ZHANG Ping. Review on Factors Affecting Silver Recovery Out of Zinc Leaching Slag[J]. Nonferrous Metals Science and Engineering, 2011, 2(4): 26-27,52.

Review on Factors Affecting Silver Recovery Out of Zinc Leaching Slag

More Information
  • Received Date: February 21, 2011
  • Published Date: August 30, 2011
  • This paper expounds the application fields of silver and the zinc leaching process. The recovery process and influencing factors out of zinc leaching slag are focused.
  • [1]
    赵怀志.银的主要应用领域和发展现状[J].云南冶金, 2002, 31(3):118-127. http://www.cqvip.com/QK/90321B/200203/6619688.html
    [2]
    刘三平.中国湿法炼锌的新进展[J].矿冶, 2009, 18(4):25-28. http://www.wenkuxiazai.com/doc/34ee19452e3f5727a5e962e4-4.html
    [3]
    董英.常用有色金属资源开发与加工[M].北京:冶金工业出版社, 2005:113-115.
    [4]
    K. R. Robilliard, J. King, J. M. Floycl. Sirosmelt Techology for Solving the Lead and Zine Industry Waste Problem[J]. The Minerals, Metals and Materials Society, 1991:331.
    [5]
    欧洲专利, EP0257548, 1980.
    [6]
    胡天绝.硫脲法浸出回收炼锌废渣中的银[J].化工环保, 1999, 16(3):175-180. http://www.cqvip.com/QK/97361X/2001005/5713009.html
    [7]
    龙小艺.用硫脲从脱硫锌精矿渣中浸出银的试验研究[J].湿法冶金, 2009, 28(3):154-156. http://www.docin.com/p-156206077.html
    [8]
    Bere Zowsry.R.M.G.S.Silver and Gold Recovery from Zine Pressure Leach Residue[A].Lead.Zine, 90[C].1990:135.
    [9]
    李树昌.用氯化溶液浸取法回收湿法炼锌残渣中的银[J].矿产综合利用, 1987, 1:11-15. http://www.cnki.com.cn/Article/CJFDTOTAL-ACJS201402004.htm
    [10]
    Tachan Kwangsan Hakhoe Chi, Metal Abs, 1980(10):11.
    [11]
    张丽军.从锌湿法冶炼酸浸渣中综合回收铅锌银[J].四川有色金属, 2008, (3):13-16. http://www.cqvip.com/Main/Detail.aspx?id=1000398004
    [12]
    刘子龙.湿法炼锌浸渣中回收银的浮选试验研究与生产实践[J].有色矿冶, 2010, 26(1):21-23. http://www.cqvip.com/QK/92607X/201001/32939357.html
    [13]
    程永彪.浸出渣银浮选工艺试验研究[J].云南冶金, 2010, 39(5):12-21. doi: 10.3969/j.issn.1006-0308.2010.05.003
    [14]
    金云虹.湿法炼锌浸出渣中银的赋存状态研究[J].北京矿冶研究总院学报, 1993, 2(1):82. http://www.cnki.com.cn/Article/CJFDTOTAL-KYZZ199301013.htm
    [15]
    邓华.银浮选的改进[J].株冶科技, 1994, 22 (4):19-21. http://www.cqvip.com/QK/92158X/199404/1592370.html
    [16]
    周国华. 提高锌浸出渣中银浮选回收率的工艺与理论研究[D]. 中南大学, 2002: 81-82.
    [17]
    刘文敏.锌系统浮选银存在的问题及改进[J].湖南有色金属, 2001, 11:5-6. http://industry.wanfangdata.com.cn/dl/Detail/Periodical?id=...
    [18]
    张万生.锌浸出渣浮选银生产实践[J].湖南有色金属, 2000, 16:86-90. http://www.cqvip.com/QK/83200X/2000S1/4000635660.html

Catalog

    Article Metrics

    Article views PDF downloads Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return