Founded in 1987, Bimonthly
Supervisor:Jiangxi University Of Science And Technology
Sponsored by:Jiangxi University Of Science And Technology
Jiangxi Nonferrous Metals Society
ISSN:1674-9669
CN:36-1311/TF
CODEN YJKYA9
RAo Yun-zhang, AI You-sun. The Ground Pressing Control and Safe Stoping of Remnant Ores[J]. Nonferrous Metals Science and Engineering, 2004, 18(4): 24-27.
Citation: RAo Yun-zhang, AI You-sun. The Ground Pressing Control and Safe Stoping of Remnant Ores[J]. Nonferrous Metals Science and Engineering, 2004, 18(4): 24-27.

The Ground Pressing Control and Safe Stoping of Remnant Ores

More Information
  • Received Date: August 17, 2004
  • Published Date: December 30, 2004
  • Copper ores of Daboshan mining area are stoped from remnant ore mainly, and the working condition is unsafety.For stoping safely, the Minkle elastic grade beam principle is adopted to analysis the mechanics of the roof, the broadly-defined sink speed is regarded as parameter of observing, and according to its jump characteristic to forecast roof board rupture in advance and stope ground pressing, corresponding ground pressing control measure is taken to offer the security for stoping of remnant Ores.
  • [1]
    周廷振, 缪协兴, 许家林.采场来压预测预报的力学分析[J].矿山压力与顶板管理, 1995, (2): 20-22. http://www.cqvip.com/QK/97910A/199502/1638121.html
    [2]
    解世俊.金属矿床地下开采(修订版)[M].北京:冶金工业出版社, 1984.9.
    [3]
    汪和平, 张开平.地下矿山残矿的回收技术[J].江西冶金, 2001, (10):27-29. http://d.wanfangdata.com.cn/Periodical/jxyj200105009
    [4]
    王昌虎.古采区残矿回采的安全管理对策[J].矿业安全与环保, 2003, (6): 9-10. http://industry.wanfangdata.com.cn/dl/Detail/Periodical?id=...
    [5]
    任天贵, 明士样, 高谦.小官庄西区地压显现宏观调查及地压控制[J].中国矿业, 1992, (9):43-48. http://www.cnki.com.cn/Article/CJFDTotal-ZGKA199202012.htm
    [6]
    张剑明.矿柱回收与地压控制[J].江苏冶金, 2003, (12): 5860. http://www.cqvip.com/qk/95422X/200306/8960103.html
    [7]
    王永前, 扬志强, 高谦.金川高应力区深部开采技术的地压控制[J].采矿技术, 2002, (9):18-19. http://www.cqvip.com/qk/92071A/200203/6956285.html
    [8]
    邹凯, 袁长林, 祝关水.平水铜矿的地压危害与安全对策[J].工业安全与防尘, 1998, (5):32-35. http://www.cnki.com.cn/Article/CJFDTOTAL-GYAF199805012.htm
    [9]
    姜立聪.猫场地下铝矿地压控制方法的初步研究[J].轻金属, 1992, (3):4-8. http://www.cqvip.com/QK/91164X/199303/1139358.html
    [10]
    郭立.铜山铜矿残矿回采的研究与实践[J].世界采矿快报, 1999.156:45-47. http://www.cqvip.com/QK/94891X/200004/4875057.html
  • Related Articles

    [1]YE Jihuan, LI Chun, YE Guangxiang. Ground pressure control of a tungsten mine[J]. Nonferrous Metals Science and Engineering, 2020, 11(6): 92-97. DOI: 10.13264/j.cnki.ysjskx.2020.06.013
    [2]ZENG Fanzhen. Ground pressure control technology in a wolframite mine[J]. Nonferrous Metals Science and Engineering, 2017, 8(1): 122-126. DOI: 10.13264/j.cnki.ysjskx.2017.01.021
    [3]JIANG Wen-wu, LI Gou-jian. Roof strata analysis on the empty area falling based on C-ALS[J]. Nonferrous Metals Science and Engineering, 2012, 3(5): 66-69,104. DOI: 10.13264/j.cnki.ysjskx.2012.05.013
    [4]ZHU Da-chang, YAN Zhi-min, CUI Xiang-fu, LI Pei. The position analysis and control simulation of 3-RPS parallel robot[J]. Nonferrous Metals Science and Engineering, 2012, 3(1): 95-100. DOI: 10.13264/j.cnki.ysjskx.2012.01.005
    [5]ZHAO Kui, YANG Tao-Bo, ZHANG Dong-Wei, WU Le-Wen, CAO Zong-Quan. Investigation of Ground Pressure and Evaluation Methods for the Tungsten Mine in Southern Jiangxi[J]. Nonferrous Metals Science and Engineering, 2011, 2(3): 47-50.
    [6]ZHOU Ke-liang, LIANG Ling. Ration Pouring Control System for Lead Anode Plate Based on Profibus[J]. Nonferrous Metals Science and Engineering, 2006, 20(4): 21-23.
    [7]YANC Zhi-gen, PI Jun-ming. Analysis on Present Status of Ground Pressure in Pangushan Mining Area and Countermeasures[J]. Nonferrous Metals Science and Engineering, 2005, 19(2): 19-22, 46.

Catalog

    Article Metrics

    Article views (110) PDF downloads (3) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return