XU Cong-wu, ZHAO Kui, XIE Dao-hui. Numerical Simulation Research on Tunnel Arrangement in Schistosity Rock[J]. Nonferrous Metals Science and Engineering, 2008, 22(3): 6-8.
Citation: XU Cong-wu, ZHAO Kui, XIE Dao-hui. Numerical Simulation Research on Tunnel Arrangement in Schistosity Rock[J]. Nonferrous Metals Science and Engineering, 2008, 22(3): 6-8.

Numerical Simulation Research on Tunnel Arrangement in Schistosity Rock

More Information
  • Received Date: June 29, 2008
  • Published Date: September 29, 2008
  • A three-dimensional model was established for underground mine by using 3D-Sigma software to analyze tunnel arrangement in schistosity rock. Maximum principal stress of tunnel surrounding rock and safety ratio of roof was studied to approve the feasibilities of tunnel arrangement, showing the best way about tunnel arrangement in schistosity rock.
  • [1]
    马华天.乌鞘岭隧道深埋软弱千枚岩变形控制施工技术[J].西部探矿工程, 2006, (S1):320-322. http://www.cqvip.com/QK/96187X/2006B06/22149316.html
    [2]
    蔡美峰, 何满潮, 刘东燕.岩石力学与工程[M].北京:科学出版社, 2002.
    [3]
    张娇, 姜谙男, 易南概, 等.东坪金矿采空区开挖过程的三维有限元数值模拟[J].中国矿业, 2006, 15(11):81-84. doi: 10.3969/j.issn.1004-4051.2006.11.026
    [4]
    赵奎.残留矿柱回采与空区稳定性的有限元模拟研究[J].采矿技术, 2002, 2(2):51-53. http://industry.wanfangdata.com.cn/yj/Detail/Periodical?id=...
    [5]
    秦艳华, 王晓军, 钟春晖, 等.矿柱回采对采空区稳定性影响数值模拟研究[J].铜业工程, 2007, (3):8-10. http://industry.wanfangdata.com.cn/dl/Detail/Periodical?id=...

Catalog

    Article Metrics

    Article views (77) PDF downloads (2) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return