Founded in 1987, Bimonthly
Supervisor:Jiangxi University Of Science And Technology
Sponsored by:Jiangxi University Of Science And Technology
Jiangxi Nonferrous Metals Society
ISSN:1674-9669
CN:36-1311/TF
CODEN YJKYA9
Volume 18 Issue 1
Mar.  2004
Turn off MathJax
Article Contents
XU Si-ling. The High-speed Construction of the Auxiliary Shaft of Dajishan Tungsten Mine[J]. Nonferrous Metals Science and Engineering, 2004, 18(1): 19-23.
Citation: XU Si-ling. The High-speed Construction of the Auxiliary Shaft of Dajishan Tungsten Mine[J]. Nonferrous Metals Science and Engineering, 2004, 18(1): 19-23.

The High-speed Construction of the Auxiliary Shaft of Dajishan Tungsten Mine

More Information
  • Received Date: December 19, 2003
  • Published Date: March 30, 2004
  • The arrangment, implement and characteristic of mechanized facilities system in the construction of the auxiliary shaft in Daijshan Tungsten Mine are introduced in this paper. According to the diameter and deep pf the shaft, the system adopts domestic a dvanced techniques, technologies and facilities, operates regular and circularly, and realizes high-speed safty construction of shaft.

Catalog

    Article Metrics

    Article views PDF downloads Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return